All Categories
Back

Fully Automatic Ball Bearing Assembly and Inspection Production Line

CIXI HOTO's the integrated production line boasts is high efficiency. The production cycle for small and medium-sized ball bearings is only 3.6-3.9 seconds .

6d0bc101-c86c-4aad-b54d-a2de1b90530d.jpg
A sealed covering designs that significantly enhances safety and cleanliness, ensuring P5-grade product bearing quality. ,Specially the line saves space – you only need 20 meters long and 1.2 meter wide of floor space. 
378369dd-9cd6-498a-bc95-c5e38678ba41.jpg
Workers can work back-to-back, requiring just 2 operators per line. Six lines require merely 8 operators, dramatically reducing costs while maintaining an elegant and professional appearance. 
305cfd57-7a3e-47c0-8171-26abf5fd6fbb.jpg
Please contact us if you are interested in these Automatic Equipment of bearings . www.zjhoto.com , [email protected] whatsapp : +8613454747535

Prev

None

ALL

CIXI HOTO provide the one-stop bearing&bearing machine service

Next
Recommended Products